Cost, time and disruption. A full replacement means stripping the shaft and rebuilding it, with the lift out of service for an extended period. A modernisation retains what is still serviceable, so it costs less, takes less time, and returns the lift to use sooner. Replacement is the right answer when the installation is beyond economic repair or the building’s requirements have fundamentally changed — and we will say so when that is the case.